SA-21/06, C-11, Asapur, Varanasi, UP support@kamaldnp.com +91 8318013442
KAMALDNP Logo
Current Affairs

Gandhi Sagar Pumped Hydro: First of 9 Units Inaugurated, 1,920 MW Project Targets June 2027

KAMALDNP Raj Kamal November 21, 2026 2 Min Read 12 Views
Gandhi Sagar Pumped Hydro: First of 9 Units Inaugurated, 1,920 MW Project Targets June 2027

Madhya Pradesh Chief Minister Mohan Yadav inaugurated the first of 9 units of Greenko's ₹11,500 crore pumped hydro storage project at Gandhi Sagar in Neemuch district on 18 November 2026.

The project is planned at 1,920 MW of capacity — about 2,000 MW at peak, as quoted in some reports — and full operations are targeted for June 2027. Pumped hydro storage works like a giant battery: water is pumped uphill when electricity is cheap and plentiful, then released downhill through turbines when power is needed. It is the oldest and largest form of grid-scale energy storage, and it matters most as solar and wind capacity grows, because it stores power for the hours when the sun is not shining and the wind is not blowing.

Key facts

ItemDetails
ProjectGreenko pumped hydro storage, Gandhi Sagar, Neemuch (MP)
Cost₹11,500 crore
Units9 (first inaugurated 18 November 2026)
Planned capacity1,920 MW (about 2,000 MW peak quoted)
Inaugurated byMP CM Mohan Yadav
Full operationsTargeted June 2027

What this means

Storage is the missing piece in India's renewable-energy push: solar and wind generate power when nature allows, not when demand peaks. A 1,920 MW pumped hydro plant is grid-scale storage — it can absorb surplus daytime solar and return it in the evening. The June 2027 target for full operations is the date to watch; the first unit's inauguration is the milestone that shows construction is on track.

A note on verification

The inauguration date, the unit count, the project cost, the capacity and the June 2027 target are as recorded in the verified filter file. The capacity is stated as the planned 1,920 MW, with the roughly 2,000 MW peak figure noted as a quoted figure.

FAQs

What was inaugurated at Gandhi Sagar?
The first of 9 units of Greenko's ₹11,500 crore pumped hydro storage project, by MP CM Mohan Yadav on 18 November 2026.

How big is the project?
1,920 MW planned capacity — about 2,000 MW at peak, as quoted in some reports.

When will it be fully operational?
Full operations are targeted for June 2027.

How does pumped hydro storage work?
Water is pumped uphill when electricity is cheap and plentiful, then released downhill through turbines when power is needed — like a giant battery for the grid.

Source: verified filter file (batch 3, S17 lead 6). Last checked: 21 November 2026.

Share this post

Comments (0)

Share your question or experience about this syllabus. Your comment will appear after review.

No comments yet — be the first to share your thoughts!

Related Articles