ISRO conducted a 200-second flight acceptance hot test of the cryogenic engine for GSLV-F19 at the ISRO Propulsion Complex, Mahendragiri, on 5 November 2026, and announced satisfactory performance on 10 November 2026.
| Item | Details |
|---|---|
| Test | 200-second flight acceptance hot test |
| Engine | Cryogenic engine for GSLV-F19 (CE-7.5, per media reports) |
| Test date | 5 November 2026 |
| Test site | ISRO Propulsion Complex, Mahendragiri |
| Result announced | 10 November 2026 — satisfactory performance |
| Mission | The engine will power GSLV-F19 carrying the NVS-04 navigation satellite |
The successful hot test clears the engine for the GSLV-F19 mission, which will carry NVS-04 — the next satellite in the NavIC series after NVS-03, which was launched on 30 October 2026. Each step in the NVS series adds to India's own navigation system.
The test date, duration, site and result are as reported in the Shanmugam IAS Academy current-affairs PDF (11 November 2026), NewsBytes and YouTube. The engine designation CE-7.5 is as reported in media coverage.
What did ISRO test on 5 November 2026?
A 200-second flight acceptance hot test of the cryogenic engine for GSLV-F19.
Where was the test conducted?
At the ISRO Propulsion Complex, Mahendragiri.
What was the result?
ISRO announced satisfactory performance on 10 November 2026.
Which mission will this engine power?
GSLV-F19, carrying the NVS-04 navigation satellite.
Source: Shanmugam IAS Academy current-affairs PDF (11 November 2026); NewsBytes; YouTube. Last checked: 21 November 2026.
Free mock tests for competitive exams — check your preparation level.
Take a Mock Test
Comments (0)
Share your question or experience about this syllabus. Your comment will appear after review.
No comments yet — be the first to share your thoughts!